The much awaited Bullet Trains will be operational in India by 2026 as per the statement of Railway Minister of India, Ashwini Vaishnaw. The first route of the Bullet train will be between Surat and Bilimora in Gujarat which will be done by 2026.
Vaishnaw was in Surat to inspect the progress of the Ahmedabad-Mumbai bullet train project. He said that initially the train will run between Surat and Bilimora and then as the tracks are ready, the train will increase.
The project is aimed at running the bullet train between Ahmedabad and Mumbai on a high speed rail (HSR) corridor at a speed of 320 kmph, covering a distance of 508 km and 12 stations. There will be 8 stations in Gujarat and 4 in Maharashtra. Till now, the work of about 61 km of pillars is almost being completed. Work is going on simultaneously on 150 km.
Story By- Saayak Karmakar, Resident Editor, Interview Times
Image Source- Google
- Exploring the Depths of Literary Creation: An Interview with Author Riddhima Sen at Jaipur Literary Walk 2024
- Sindhu and Lakshya Seeded Top in Singles Draws for Syed Modi Badminton Championship
- PM Modi Inaugurates World’s Tallest Railway Bridge Over Chenab River in Jammu & Kashmir
- Parliament Passes Waqf Amendment Bill 2025; BJD MP Supports It in Rajya Sabha